[as of 2019 ]
City
Founded:
1826
Population - urban:
1 000 000 (06.2019)
Population - metro:
1 323 783 (2016)
Location:
Ottawa
The capital of Canada and the 4th largest city in Canada. Gatineau
Network Stats
Operator: OC Transpo
Horse tram opened:
07.1870
Electric tram opened:
25.06.1891
Electric tram closed:
01.05.1959
• Line 2 - Trillium Diesel Light Rail Line opened:
15.10.2001
Gauge:
1435 mm
Line length:
8 km.
System track length:
11,4 km. (one-way)
Number of stations:
5
Number of passenger vehicles:
12
• Line 1 - Confederation Electric Light Rail Line opened:
14.09.2019
Gauge:
1435 mm
Line length:
12,5 km.
System track length:
30 km. (one-way)
Number of stations:
13 (3 underground)
Number of passenger vehicles:
34
Network map:
09.2019
O-train
xxx
xxx
xxx
Rolling Stock
• Line 1 - Confederation Electric Light Rail:
Alstom Citadis Spirit
34 cars [2016-2019]
• Line 2 - Trillium Diesel Light Rail:
Bombardier Talent BR643
9 cars [2001] (operated 2001-2015)
Alstom Coradia LINT 41
12 cars [2013] (operate 2015+)
xxx
Photos
Last updated:
01-Dec-2019
© 2002 Author: Yury Maller - Usage of material found herein for public display is possible with authors' permission only.