TURKESTAN
UNFINISHED TROLLEYBUS LINE

[as of 2014 ]

City

Founded: 500
Population: 155 552 (2014)
Location: Tukrestan

Network Stats

Overhead length: 16,8 km. (one-way)
Number of routes: 1

Network map: 2000

A trolleybus line was under construction due to be opened for the city’s anniversary in 2000. The project was abandoned.

Photo gallery


BACK

Last updated: 15-Sep-2014
© 2002 Author: Yury Maller - Usage of material found herein for public display is possible with authors' permission only.